Forum Discussion

Anonymous's avatar
Anonymous
Not applicable
2 years ago
Solved

progress displayed as a percentage

I have set up a periodic update of a report.
Is it possible to check the progress of the update when it is running?
Is the progress displayed as a percentage?

  • No this is not possible. There are too many unknown factors involved to be able to reliably calculate a percentage including many factors outside of the control of Power BI like the network bandwidth and the load on the source system.

  • Yes, the schedule page should show whether the job is currently running or the status of the previous run if it's not currently running.

3 Replies

  • No this is not possible. There are too many unknown factors involved to be able to reliably calculate a percentage including many factors outside of the control of Power BI like the network bandwidth and the load on the source system.

    • Anonymous's avatar
      Anonymous
      Not applicable

      Thank you for your response.
      I can't see the percentages, but can I check to see if it is running?

  • Yes, the schedule page should show whether the job is currently running or the status of the previous run if it's not currently running.