Forum Discussion
Access to refresh in semantic model for a user
I am the owner of a report. I have access to refresh in the semantic model but how can I allow another user to have the refresh access?
Sharing with the user does not help.
You could use a Power Automate button to run a flow to request the refresh. The UX will be horrible as there is no feedback.
3 Replies
- lbendlinSuper User
Why would you want to give the user that access? Remember that a refresh is an asynchronous operation. The user will have no way of knowing how long the refresh is taking and what the result will be.
- AsantezaKRegular Visitor
The user is updating the reports from SharePoint lists. The reports are only updated after refreshing the system. I can do it anytime or have to wait for the sheduled refresh.
- lbendlinSuper User
You could use a Power Automate button to run a flow to request the refresh. The UX will be horrible as there is no feedback.