Forum Discussion
db042190
Impactful Individual
2 months agoso many file types checking my report into devops
Hi we got a hands on tour of setting up and using a deployment pipeline in power bi...one with hooks into our devops project branches as well. I looked at what got checked in and was floored. The...
- 2 months ago
Hi db042190,
When checked into Git, Fabric uses the PBIP Power BI format, which stores everything as text so that it can be tracked in Git version control.
If you have a pbix file open in desktop, and you save it as a Power BI Project (PBIP) file, you will see the same file structure that you see in Git.
tayloramy
Super User
2 months agoHi db042190,
The easiest way to restore a report from git is to clone the repo in a workspace.
Create a new workspace, connect it to the git branch with the report you want to restore, and then pull from git. That will put the report into the workspace where you can then download it as a regular pbix file, or move it to wherever you wish it to be.