Microsoft product team confirmed, that unfortunately, we do not have a choice. The only way to move on is to accept the changes and commit them: a) all Workspaces one by one into Git, or b) from the March 2024 PBI Desktop -> Git -> Workspaces, as I mentioned above.
The fastest way is option (a), but If your Git branch connected to the workspaces (e.g. main branch) doesn't allow direct commits (only Pull Requests) then you'll have to disable the commit policy, commit all from workspaces, enable the commit policy back and then resolve all conflicts that the developers will have.
21 Replies
- AnonymousNot applicable
I believe we found a fix. It is a pain, but we disconnected the repository from the workspace, opened all the reports in the March update of the PowerBI Desktop, saved each report (so that it could edit the PBIP folder structrure) and saved + committed. Then we re-connected the workspace to the repository and were back up and running.
After this, we tested adding a new report and it seemed to work. Wonder if MSFT did their testing with cleaned environments with this latest release...
- wiSama
Advocate I
Same here, unable to publish changes from git to Workspace and also the other way around. Everything that was published is now uncommited, and when I tried to remove the git integration and redo it, it won't sync anymore. This is one of the errors I receive.
Workload Error Code PowerBIMetadataArtifactDisplayNameInUseException
- AnonymousNot applicable
Same here! Did Microsoft comment on this?
What are we supposed to do now? just wait? Or commit everything?
I this it has to do with new Git version, as it says now version 4.0 instead of 1.0, deleted 2 json files and added a "platform" file to the report folder...- wiSama
Advocate I
Just saw the update removing 2 json files, but they said in the Power BI March 2024 Feature Summary site: Beyond these adjustments, there will be no impact on your Git workflow.
Currently, I'm just waiting a little bit, but I think I might try to update the model and commit it to the service
- UnknownDevelopeFrequent Visitor
Same here, unable to move changes to production.
- joaogalhardoRegular Visitor
Same here, probably some problem with the new fabric update
- KEBUDFrequent Visitor
Same here, have to publish reports directly to the workspace for now I guess?
- AnonymousNot applicable
Same here ! It's probably due to the new update.
- Romuald1973New Member
Same here also.
Someone in PowerBI / Fabric Team, please advise ? - EvanSkamFrequent Visitor
I just wanted to comment here to share my experience.
Yesterday afternoon around 3pm MST I noticed several new untracked files in my local git repo after I saved a pbip file (I've been using the Git integration with successfully with this, and other files for ~1 month).
These files were introduced over 2 saves:
*/definition.pbism
*.Report/.platform
*.Report/semanticModelDiagramLayout.json
When I attempted to sync changes in my workspace, I received this error:Error message:
Workload Error Code Workload_FailedToParseFile
Workload Error Message Error while reading 'definition.pbidataset'. DatasetDefinition: Required artifact is missing.
This morning I'm seeing a bit different behavior with the request to merge and override the objects in my workspace.
Just now, I created a new workspace and synced my changes there without an issue. For reference, I was unable to do this yesterday evening (see above error). This seems to be a good signal for continuing in our prd env, however I will continue testing in the test workspace to ensure there won't be breaking changes.
- EvanSkamFrequent Visitor
To close the loop:
Seems like the issues of yesterday have been fixed. I did have to merge/override my semantic model, which is not something that has been necessary up until this morning.Having rehersed it a couple of time, it seems to be stable again.
- joaogalhardoRegular Visitor
Are you using the new TMDL preview feature in PBI Desktop ?
- Johag
Advocate II
Same issue here. Appeared a couple of hours ago.
I tried to checkout to a new branch, commit and then switch back to main. But I received same error. One of the report throw error: "PowerBIMetadataArtifactDisplayNameInUseException"
- Johag
Advocate II
We have several workspaces in my organisation and for one it worked to just "Update all". Word of advice, then repo will update to version 4.0 and you will need latest Power BI version to open files after sync. If your company/organisation have their own version that might be a couple of versions behind you won't be able to open files after update.
For one of our workspaces I can't sync, still get error message "PowerBIMetadataArtifactDisplayNameInUseException".
Anyone experienced same and have any suggestion how to fix?
- Johag
Advocate II
If anyone get same error message as I did, I fixed by disconnect Git from workspace and then connect to same repo and then finally made a sync.
- ElyatanVenceslaNew Member