Forum Discussion
Gateway Scheduled refreshing Problem
Good morning, the error is always this; what always changes is the table. But when I do the update manually, without using scheduling, the update happens normally.
Erro de fonte de dados: {"error":{"code":"DM_GWPipeline_Client_GatewayUnreachable","pbi.error":{"code":"DM_GWPipeline_Client_GatewayUnreachable","parameters":{},"details":[],"exceptionCulprit":1}}} Table: empresas_cnaes.<br />Cluster URI: WABI-BRAZIL-SOUTH-redirect.analysis.windows.net<br />ID da atividade: 97c66a82-8e46-41d1-bb5a-f5fe2aa57c0d<br />Solicitar ID: 6a13de35-e6b9-4e86-8dd3-59b73e388674<br />Hora: 2025-09-16 16:32:30Z
- tayloramy1 year ago
Super User
Hi Anonymous,
This error means the gateway isn't reachable. Can you confirm that the data gateway is online?
If you found this helpful, consider giving some Kudos. If I answered your question or solved your problem, mark this post as the solution.
- Anonymous1 year agoNot applicable
Hi Anonymous ,
Thanks for sharing the details. Since the refresh works manually but fails on schedule with the GatewayUnreachable error, this usually points to a gateway or network reliability issue.
- Confirm the gateway is running the latest version and hasn’t gone offline during scheduled refresh.
- Check if there are any timeouts, throttling, or antivirus/firewall policies that might intermittently block the gateway service.
- Review the gateway logs around the failure timestamp for more clues.
If the problem persists even after verifying these, I’d recommend raising a Microsoft support ticket with the Activity ID and Request ID you shared, that way the product team can trace the failing pipeline run directly.
Thanks,
Akhil.