Forum Discussion
HELP!! Calculating
Hi RvdHeijden,
You need multiple columns. So is it necessary to use only one formula?
Seems you already have the formulas. Can you share the original data and the expected result?
Best Regards,
Dale
- RvdHeijden8 years ago
Post Prodigy
v-jiascu-msft its not necesarry to have one formula.
Table 'Adressen'
Straatnaam Huisnummer Toevoeging Civiel gesloten DP naam Gebiedstype Zitterstraat 2 24-9-2018 STAS_1E_DP035 Kern Zitterstraat 4 18-5-2018 STAS_1E_DP037 Kern Zitterstraat 6 A 14-9-2018 STAS_1E_DP035 Buitengebied Zitterstraat 8 2-8-2018 STAS_1E_DP035 Industrieel Zitterstraat 10 4-9-2018 STAS_1E_DP036 Industrieel Zitterstraat 12 STAS_1E_DP037 Buitengebied Zitterstraat 14 STAS_1E_DP037 Kern Zitterstraat 16 8-8-2018 STAS_1E_DP040 Kern Tabel 'Lengths'
DP naam Average length Kern Average length Buitengebied Average length Industrieel STAS_1E_DP035 56,0 124,6 89,5 STAS_1E_DP036 30,0 63,4 48,6 STAS_1E_DP037 29,5 89,6 74,9 STAS_1E_DP040 14,9 111,4 65,0 These were the tables on which the formula was based, this way i got the total amount of meters per team based on a certain area and buildingtype.
I also have a different Table named 'Schades' were we register the damages that occured during our work.
That table looks like this
Streetname Housenumber Addition Damaged Infrastructure Team Exportstraat 7 CAI [Avra] Ploeg 1 Gemertseweg 122 A CAI [Konax] Ploeg 3 Nullen 11 Koper [Konax] Ploeg 3 Peelkant 70 Gas [Konax] Ploeg 5 Peelkant 112 B Water [v. Beers] Ploeg 3 So that means for example that [Konax] Ploeg 3 has caused 2 damages (1 time the CAI cable and 1 time Koper kabel)
In the first formula we calculated that [Konax] Ploeg 3 has a production of 2500 m1 and based on the 2 damages they have a damage quote of 2500 / 2 = 1250, so that means they have 1 damage for every 1250 meters.
I want that calculation per typ of damage (infrastructure) and per Team but given the relationships between the tables that shouldn't be a probleem
The expected outcome should be something like
Damaged Infrastructure [Avra] Ploeg 1 [Konax] Ploeg 3 [Konax] Ploeg 5 [v. Beers] Ploeg 3 CAI 800 900 1500 1200 Koper 2000 1600 500 1200 Gas 1500 500 1200 1500 Water 3000 3000 2500 4000 Totaal 2200 1200 1800 2700 The values should be the SUM of total amount in Meters devided by the number of damages of a certain Infrastructure and off course an overall average
- RvdHeijden8 years ago
Post Prodigy
v-jiascu-msft any ideas ?
- v-jiascu-msft8 years ago
Microsoft Employee
Hi RvdHeijden,
How does the table 'Schades' connect to others? For example, the damage of [[Avra] Ploeg 1] is 1. But how can we get the total production?
Best Regards,
Dale- RvdHeijden8 years ago
Post Prodigy
v-jiascu-msft thanks for helping
This is the formula that calculates the production
Gegraven m1 (productie) =
IF (
Adressen[civiel gesloten] <> BLANK ();
SWITCH (
TRIM ( Adressen[Gebiedstype] );
"Kern"; RELATED ( Lengtes[Gemiddelde graaflengte Kern] );
"Buitengebied"; RELATED ( Lengtes[Gemiddelde graaflengte Buitengebied] );
"Industrieel"; RELATED ( Lengtes[Gemiddelde graaflengte Industrieel] );
BLANK ()
)
)It refers to the Adress tabel with 'related' and here is a picture with the relationships
the lengths come out of the 'Lengtes' table so there is a relationship between them