Forum Discussion
JimJim
Responsive Resident
3 years agoDifferent time periods using the same drill through
Hi Guys,
Attached a link to a test report: test.pbix
I have a page with 2 measures, Quote Count and Quote Count R3M. I would like to be able to drill through to the same drill through page but only show data for the selected measure. If I drill through on Quote Count I would like to see quotes for only that month. If I drill through in Quote Count R3M I would like to see only quotes for the previous 3 months. Is this possible?
2 Replies
- amitchandak
Super User
JimJim , Create a calculation group with measure. That should convert the measure to dimension. And that should allow you to drill down using the measure
- JimJim
Responsive Resident
Hi amitchandak , thank you for your reply, but I have no idea what this means. Are you able to provide a link to a video / blog etc?