Correct SUMMARIZATION in a SUMMARIZE TABLE
Hi there, I need to achieve something and I know it's possible, only I don't know how and have spent too many days struggling with this. It will take me a bit to explain, so thanks in advance x your...
- 3 years ago
Anonymous Maybe because in this PBIX I get identical results in the summarized table and the table visual. See PBIX below.
Anonymous
3 years agoNot applicable
This is an example of the data:
| PROJECT | TASK | TEAM | PHASE | Planned Hours |
| 89685 | Design Check | CCB | Phase 01 | 43 |
| 89685 | Prod Detail | CCB | Phase 09 | 42 |
| 89685 | Prod Detail | CCB | Phase 08 | 40 |
| 89685 | Prod Detail | VVD | Phase 09 | 35 |
| 89685 | Prod Detail | VVD | Phase 04 | 25 |
| 89685 | Prod Detail | VVD | Phase 05 | 25 |
| 89685 | Review | CCB | Phase 08 | 24 |
| 89685 | Prod Check Trim | CCB | Phase 08 | 21 |
| 89685 | Prod Detail | VVD | Phase 01 | 20 |
| 89685 | Prod Detail | VVD | Phase 02 | 20 |
| 89685 | Prod Detail | VVD | Phase 04 | 20 |
| 89685 | Prod Detail | VVD | Phase 05 | 20 |
| 89685 | Prod Check | CCB | Phase 01 | 16 |
| 89685 | Prod Check | CCB | Phase 02 | 16 |
| 89685 | Prod Check | CCB | Phase 03 | 16 |
| 89685 | Prod Check | CCB | Phase 04 | 16 |
| 89685 | Prod Check | CCB | Phase 05 | 16 |
| 89685 | Prod Detail | VVD | Phase 01 | 11 |
| 89685 | Prod Detail | VVD | Phase 02 | 11 |
| 89685 | Prod Detail | VVD | Phase 03 | 11 |
| 89685 | Prod Detail | VVD | Phase 04 | 11 |
| 89685 | Prod Detail | VVD | Phase 05 | 11 |
| 89685 | Design | CCB | Phase 01 | 8 |
| 89685 | Prod Detail Corrections | VVD | Phase 03 | 8 |
| 89685 | Drawings Review | CCB | Phase 01 | 4 |
| 89685 | Drawings Review | CCB | Phase 02 | 4 |
| 89685 | Drawings Review | CCB | Phase 04 | 4 |
| 89685 | Drawings Review | CCB | Phase 05 | 4 |
| 89685 | Prod Detail | CCB | Phase 09 | 4 |
| 89685 | Drawings Review | CCB | Phase 03 | 1 |
| 89685 | Drawings Review | CCB | Phase 09 | 0.5 |
| 89685 | Drawings Review | CCB | Phase 09 | 0.5 |
| 89685 | Drawings | CCB | Phase 09 | 0.5 |
| 89685 | Drawings | CCB | Phase 01 | 0.5 |
| 89685 | Drawings | CCB | Phase 02 | 0.5 |
| 89685 | Drawings | CCB | Phase 03 | 0.5 |
| 89685 | Drawings | CCB | Phase 04 | 0.5 |
| 89685 | Drawings | CCB | Phase 05 | 0.5 |
| 89685 | Drawings Review | CCB | Phase 01 | 0.06 |
| 89685 | Drawings Review | CCB | Phase 02 | 0.06 |
| 89685 | Drawings Review | CCB | Phase 03 | 0.06 |
| 89685 | Drawings Review | CCB | Phase 04 | 0.06 |
| 89685 | Drawings Review | CCB | Phase 05 | 0.06 |
| 89685 | Design Release to Drafting | CCB | Phase 01 | 0 |
| 89685 | IFC Drawings Mailed | CCB | Phase 01 | 0 |
| 89685 | IFC Drawings Mailed | CCB | Phase 02 | 0 |
| 89685 | IFC Drawings Mailed | CCB | Phase 03 | 0 |
| 89685 | IFC Drawings Mailed | CCB | Phase 04 | 0 |
| 89685 | IFC Drawings Mailed | CCB | Phase 05 | 0 |
| 89685 | Release to Fabrication | CCB | Phase 01 | 0 |
| 89685 | Release to Fabrication | CCB | Phase 02 | 0 |
| 89685 | Release to Fabrication | CCB | Phase 03 | 0 |
| 89685 | Release to Fabrication | CCB | Phase 04 | 0 |
| 89685 | Release to Fabrication | CCB | Phase 05 | 0 |
| 89685 | Release to Fabrication | CCB | Phase 08 | 0 |
| 89685 | Release to Fabrication | CCB | Phase 09 | 0 |
| 72589 | Design Check | CCB | Phase 01 | 50 |
| 72589 | Prod Detail | CCB | Phase 09 | 32 |
| 72589 | Prod Detail | CCB | Phase 08 | 80 |
| 72589 | Prod Detail | VVD | Phase 09 | 53 |
| 72589 | Prod Detail | VVD | Phase 04 | 52 |
| 72589 | Prod Detail | VVD | Phase 05 | 52 |
| 72589 | Reviewdwgs | CCB | Phase 08 | 42 |
| 72589 | Prod Check Trim | CCB | Phase 08 | 12 |
| 72589 | Prod Detail Corrections | VVD | Phase 01 | 20 |
| 72589 | Prod Detail Corrections | VVD | Phase 02 | 10 |
| 72589 | Prod Detail Corrections | VVD | Phase 04 | 35 |
| 72589 | Prod Detail Corrections | VVD | Phase 05 | 25 |
| 72589 | Prod Check | CCB | Phase 01 | 16 |
| 72589 | Prod Check | CCB | Phase 02 | 35 |
| 72589 | Prod Check | CCB | Phase 03 | 45 |
| 72589 | Prod Check | CCB | Phase 04 | 52 |
| 72589 | Prod Check | CCB | Phase 05 | 83 |
| 72589 | Prod Detail | VVD | Phase 01 | 45 |
| 72589 | Prod Detail | VVD | Phase 02 | 12 |
| 72589 | Prod Detail | VVD | Phase 03 | 10 |
| 72589 | Prod Detail | VVD | Phase 04 | 98 |
| 72589 | Prod Detail | VVD | Phase 05 | 83 |
| 72589 | Design | CCB | Phase 01 | 88 |
| 72589 | Prod Detail Corrections | VVD | Phase 03 | 5 |
| 72589 | Drawings Review | CCB | Phase 01 | 7 |
| 72589 | Drawings Review | CCB | Phase 02 | 4 |
| 72589 | Drawings Review | CCB | Phase 04 | 2 |
| 72589 | Drawings Review | CCB | Phase 05 | 10 |
| 72589 | Prod Detail | CCB | Phase 09 | 3 |
| 72589 | Drawings Review | CCB | Phase 03 | 10 |
| 72589 | Drawings Review | CCB | Phase 09 | 0.5 |
| 72589 | Drawings Review | CCB | Phase 09 | 0.5 |
| 72589 | MailDrawings | CCB | Phase 09 | 0.5 |
| 72589 | MailDrawings | CCB | Phase 01 | 0.5 |
| 72589 | MailDrawings | CCB | Phase 02 | 0.5 |
| 72589 | MailDrawings | CCB | Phase 03 | 0.5 |
| 72589 | MailDrawings | CCB | Phase 04 | 0.5 |
| 72589 | MailDrawings | CCB | Phase 05 | 0.5 |
| 72589 | Sealing | VVD | Phase 01 | 1 |
| 72589 | Sealing | VVD | Phase 02 | 1 |
| 72589 | Sealing | VVD | Phase 03 | 1 |
| 72589 | Sealing | CCB | Phase 04 | 1 |
| 72589 | Sealing | CCB | Phase 05 | 1 |
| 72589 | Design Release to Fab | CCB | Phase 01 | 0 |
| 72589 | IFC Drawings Mailed | CCB | Phase 01 | 0 |
| 72589 | IFC Drawings Mailed | CCB | Phase 02 | 0 |
| 72589 | IFC Drawings Mailed | CCB | Phase 03 | 0 |
| 72589 | IFC Drawings Mailed | CCB | Phase 04 | 0 |
| 72589 | IFC Drawings Mailed | CCB | Phase 05 | 0 |
| 72589 | Release to Fabrication | CCB | Phase 01 | 0 |
| 72589 | Release to Fabrication | CCB | Phase 02 | 0 |
| 72589 | Release to Fabrication | CCB | Phase 03 | 0 |
| 72589 | Release to Fabrication | VVD | Phase 04 | 0 |
| 72589 | Release to Fabrication | VVD | Phase 05 | 0 |
| 72589 | Release to Fabrication | VVD | Phase 08 | 0 |
| 72589 | Release to Fabrication | VVD | Phase 09 | 0 |
Greg_Deckler
Community Champion
3 years agoAnonymous What about this?
Table 2 =
VAR __Table =
ADDCOLUMNS(
SUMMARIZE('Table', [PROJECT], [PHASE], "Hours", SUM('Table'[Planned Hours]), "CCB", SUMX(FILTER('Table',[TEAM] = "CCB"),[Planned Hours])),
"Ratio", DIVIDE([CCB], [Hours])
)
RETURN
__Table