Grantt chart with Deneb

Hi everyone!

 

As I have met the requiremnts to build grantt chart with multiply start and end dates per row I have decided to built it on Deneb.

The issue is that for y Axis, as is not continous, am able to code it that when we change the period and are more rows- visualisation can adjust itself to make it readible. But on x axis as it continous is impossible to do

 When I change the period to the e.g. 1 month the numerous tasks per row are side by side and made hard to read. Is there any walkaround?

I cannot use matrix with conditiional formating as gantt chart instead as for my date/Time I am using date plus Time with hours and secconds 

No RepliesBe the first to reply